+32 000 00 00 00 Active throughout Belgium NL · EN · FR
M2 Calculator: work out your m² and price info@bouwsectorbelgie.be
Request your free quote Call +32 000 00 00 00
Prices M2 Calculator
Wallpaper Wallpapering Renovation fleece Glass fleece wallpaper Woven glass fibre wallpaper Glass fibre wallpaper Non-woven wallpaper Ceiling wallpapering Photo wallpaper fitting Wallpaper removal
Plastering Plastering Ceiling plastering Smoothing textured plaster Bathroom plastering Skim plaster Exterior wall rendering Hire a plasterer
Painting Painting Wall painting Staircase painting Ceiling painting Ceiling spraying Window frame and door painting Hire a painter
Renovation Home renovation Renovating after purchase Bathroom Kitchen Flooring Extension Dormer Windows Insulation Electrics House clearance
New-build finishing Knowledge base How it works Reviews About us Contact

How many m² can a plasterer do per day?

Geert Jan Hendrik, director of Bouwsector BelgiëBy the Bouwsector België team, 97 in-house tradespeople · reviewed by Geert Jan Hendrik, director · updated

A plasterer at Bouwsector België plasters about 100 m² per day on average. How much it will be on your job depends on the substrate, the layer thickness, whether it is a wall or a ceiling, and how many corners and openings there are. For your schedule, what matters next is mainly the drying time, because with gypsum plaster that takes longer than the plastering itself.

Want to know how many days your plastering will take? Request your quote

Our own plasterers measure up your walls, and you get the schedule and a fixed price up front in the quote

Rated 4.9 out of 5. 4.9 from 215+ Google reviews 97 in-house tradespeople on permanent contracts 10 years of experience

What determines how many m² a plasterer does per day and per hour?

That 100 m² is an average across ordinary jobs. A fixed number of m² per hour therefore does not exist: covering up, corner beads and joints around window frames and doors are not measured per m². A large, empty wall in a new-build home goes faster than an old stairwell with pipes and frames. These are the factors that set the pace on the day itself.

FactorEffect on the pace
PreparationCovering the floor, fitting corner beads and pre-treating the substrate all come before plastering
Wall or ceilingA ceiling is heavier work and more demanding, because light falls along it at a low angle
Layer thicknessAccording to Knauf, a layer thicker than 25 mm goes on in two passes, waiting until the first has hardened
Old layersIf old plasterwork has to come off first, that is a separate stage of work
Corners, frames and pipesEvery junction takes time that does not show up in m²
TemperatureBelow +5 °C, no indoor plastering is done

Tradesman from Bouwsector België holding a long trowel upright against a wall, with a second trowel in his other hand

There is also a limit in the material itself. In the technical data sheet for MP 75 gypsum plaster, Knauf gives a working time of roughly 3 to 3.5 hours, from mixing to finishing. A plasterer therefore works in sections that he can get flat and smooth within that time, and does not start a whole house in one go.

The temperature limit comes from the same source: at least +5 °C, for at least 48 hours after application. In winter, you therefore need to plan plastering around the cold.

How many days will plastering your job take?

With the average of 100 m² per day you can make a first estimate. The table assumes one plasterer and counts only the plastering, not the drying time. You can quickly work out the m² of your own walls with the m² calculator.

JobArea, approximatelyPlastering, indication
One wall or a toiletup to 20 m²Part of a day
Bedroom, walls and ceiling50 m²Half a day
Living room, walls and ceiling100 m²1 day
Upper floor200 m²2 days
Whole house with 240 m² of wall and 55 m² of ceiling295 m²3 days

An indication based on the average, not a promise. If old layers have to come off, or there are many external corners or a high stairwell, it takes longer. The schedule for your job is in the quote, after the site visit. For the cost of a whole house like this we have prepared a worked example for a complete home.

Isn’t a plasterer who does more m² per day better?

Not automatically. It is an understandable thought: more m² per day means fewer days and so less disruption. But the time a plasterer spends on a wall goes mostly into getting it flat and finishing it smooth, and that is where you see the difference later in raking light.

Besides, fast plastering saves only a few days, while the drying time can last weeks. Finishing the plastering a day earlier does not let you paint sooner if the layer is still wet. A high pace at the start therefore rarely makes the job much shorter.

So do not compare on m² per day, but on what you get in black and white up front: the price, what is included, and when the wall is ready for painting or wallpapering. And if you are quoted a price per hour or per day, set what a plasterer costs per hour or per day alongside a fixed price per m².

Three tradespeople in white hard hats seen from behind on a snow-covered site next to new-build houses

How long from the first plastering day to a painted wall?

After plastering come drying, priming and painting. It is mainly the drying that determines how long the whole route takes, and so often also how long a renovation takes. The drying time depends on how thick the layer is.

  • Gypsum plaster, ready for paint. According to Knauf, sufficiently dry after about four weeks under good conditions.
  • Skim coat or film layer. For a complete home, 3 to 5 days for application and drying, faster in summer.
  • Primer. According to the product sheet, Sigmafix Universal can be recoated after about 6 hours, at 23 °C and 50% relative humidity.
  • Fleece and painting. Papering a complete home with fleece and painting it takes us 3 days.

That is why on new builds we often work with skim coat and fleece. The layer dries in days instead of weeks, and fleece bridges the shrinkage cracks that a new home develops in its first years. After all, how long plaster needs to dry ultimately determines when you can paint.

How do we schedule the plastering in your home?

The work is done by our own plasterers, not subcontractors. One of them is Bram, who has worked with us for 7 years. We have 32 on permanent contracts, as part of a team of 97 tradespeople that also includes 40 wallpaper hangers and 25 painters. That lets us schedule the plastering, the drying and the next step one after the other ourselves.

When you apply, tell us which walls and ceilings are involved, roughly how many m², and whether old layers have to come off. The free quote you receive within 24 hours then already contains a first schedule, with the drying time included. At the site visit we measure up and look at the substrate, so that the schedule matches what really needs to be done.

Prices exclude VAT. For renovating a home over 10 years old, 6% VAT usually applies; otherwise it is 21%.

Want to know when your walls will be ready for paint or wallpaper?

Request your free quote

Ready to plan? Then you can hire a tradesman for your plastering with a single request.

FAQ

Frequently asked questions

How many m² do you plaster per hour?

A plasterer covers about 100 m² per day on average. There is no fixed figure per hour, because covering up, corner beads and joints around window frames and doors are not measured per m². A large, empty wall therefore goes faster than a small room with many corners.

How long does a plasterer take for a whole house?

A house with 240 m² of wall and 55 m² of ceiling comes to 295 m² in total. With the average of 100 m² per day, that is about 3 days of plastering for one plasterer. After that, according to Knauf, gypsum plaster needs about four weeks to dry under good conditions before it is painted.

Does a plasterer plaster a ceiling as fast as a wall?

Usually not. Working overhead is heavier, and a ceiling has to be finished more precisely, because light falls along it at a low angle. For MP 75 gypsum plaster on a ceiling, Knauf also specifies a layer of no more than 15 mm in one pass.

How long after plastering can you paint?

Only once the layer is completely dry and has been primed. According to Knauf, gypsum plaster can be sufficiently dry after about four weeks under good conditions. A thin film layer dries much faster: 3 to 5 days for a complete home.

How many m² of wallpaper do you strip per day?

Our tradespeople strip about 100 m² of wallpaper per day on average. If the wall then has to be plastered, a plasterer also covers about 100 m² per day on average. That is how we schedule stripping and plastering one after the other.